Due to severe air pollution in Delhi and the NCR, Stage 3 of the Graded Response Action Plan (GRAP) is being implemented.
Because of the extent of the issues, the home required a significant renovation. To address the damp, modern dry-lining walls were removed, along with layers of non-breathable plaster. Exposing the ...
The cook (or chef)'s table dates back to the Victorian period, when most kitchens would have a large but slim workstation, ...
The Fulton Elementary School, built in 1916 as the former Boys' High School, is on West Orange Street. It has a plaster-cast Vitruvian scroll as decorative trim defining the first floor from second ...